Ongoing Projects

One thing I ask of the Lord. This I long to dwell in the house of the Lord,
all the days of my life.

Ongoing Projects

Aba Diocesan Pastoral Centre

It is an amalgam of architectural novelty and aesthetic splendour. Unprecedented and unparalled. Palatial and celestial. Lavishly furnished with a state-of-the-art details. Located in a luxuriant and picturesque site. A class of five star hotel. A home of welcome. It is the proposed Aba Diocesan pastoral center.

2 Kings 12:11
"They gave the money which was weighed out into the hands of those who did the work, who had the oversight of the house of the LORD; and they paid it out to the carpenters and the builders who worked on the house of the LORD".
Come let us build a house for the Lord.

SUMMMARY COST OF EACH OF THE GUSET HOUSE
SUBSTRUCTURE
9,824,720.00
FRAME
8,763,100.00
UPPER FLOOR
10,539,600.00
ROOF CONSTRUCTION AND COVERING
2,595,000.00
STAIRCASES
6,248,900.00
WALLS
15,320,700.00
WINDOWS
3,334.350.00
DOORS
5,654,950.00
FINISHINGS
15,976,500.00
PAINTING AND DECORATIONS
3,561,600.00
MECHANICAL INSTALLATIONS
4,405,700.00
ELECTRICAL INSTALLATIONS
8,000,000.00
SUB TOTAL 1
94,225,120.00
ADD PRELIMINARIES @ 2%
1,884,502.40
SUB TOTAL 2
96,109,622.40
ADD 5% VAT
4,805,481.12
ADD CONTIGENCIES
4,711256.00
ESTIMATED TOTAL COST OF EACH HOUSE
105,626,359.52
*There are five (5) prototype Guest House Blocks
SUMMMARY COST OF ADMINISTRATIVE BUILDING
SUBSTRUCTURE
9,734,860.00
FRAME
3,687,000.00
UPPER FLOOR
5,738,100.00
ROOF CONSTRUCTION AND COVERING
5,053,050.00
STAIRCASES
2,320,900.00
WALLS
7,666,400.00
WINDOWS
2,932,200.00
DOORS
2,511,900.00
FINISHINGS
9,259,200.00
PAINTING AND DECORATIONS
1,763,200.00
MECHANICAL INSTALLATIONS
1,248,400.00
ELECTRICAL INSTALLATIONS
4,200,000.00
SUB TOTAL 1
56,115,210.00
ADD PRELIMINARIES @ 2%
1,122,304.20
SUB TOTAL 2
57,237,514.20
ADD 5% VAT
2,861875.71
ADD CONTIGENCIES
2,805,760.50
ESTIMATED TOTAL COST
62,905,150.41
SUMMMARY COST OF KITCHEN, LAUNDRY & DINNING BLOCK
SUB-STRUCTURE
6,109,600.00
SUPER-STRUCTURE
5,234,700.00
ROOF CONSTRUCTION AND COVERING
8,884,550.00
WINDOWS
2,260,600.00
DOORS
1,125,800.00
FINISHINGS
4,641,150.00
PAINTING AND DECORATIONS
612,800.00
MECHANICAL INSTALLATIONS
2,077,600.00
ELECTRICAL INSTALLATIONS
3,000,000.00
SUB TOTAL 1
33,946,800.00
ADD PRELIMINARIES @ 2%
678,936.00
SUB TOTAL 2
34,625,736.00
ADD 5% VAT
1,731,286.80
ADD CONTIGENCIES
1,697,340.00
ESTIMATED TOTAL COST
38,054,340.80
SUMMMARY COST OF AUDITORIUM BUILDING
SUBSTRUCTURE
15,805,820.00
FRAME
7,406,900.00
ROOF CONSTRUCTION AND COVERING
16,995,18000
STAIRCASES
1,770,800.00
WALLS
6,923,200.00
WINDOWS
3,975,400.00
DOORS
1,505,850.00
FINISHINGS
9,687,300.00
PAINTING AND DECORATIONS
1,762,000.00
MECHANICAL INSTALLATIONS
1,115,200.00
ELECTRICAL INSTALLATIONS
5,200,000.00
SUB TOTAL 1
72,147,650.00
ADD PRELIMINARIES @ 2%
1,442,953.00
SUB TOTAL 2
73,590,603.00
ADD 5% VAT
3,679,530.15
ADD CONTIGENCIES
3,607,382.50
ESTIMATED TOTAL COST
80,877,515.65
To Make Your Donations Call:

LITURGICAL CALENDAR

SOLEMNITY OF CHRIST THE KING

Date: 2021-09-03 - 2021-12-31

The Solemnity of Christ the King will be held on 27th November, 2021.

This Solemnity which is the official feast of the Diocese, and also the feast of the Cathedral Parish, will be held in the Cathedral. It will begin with a Pontiifical High Mass at exactly 10:45am. A mass which will be presided by the Chief Shepherd of the Catholic Diocese of Aba, Most Rev. Prof. Augustine Ndubueze Echema.

After the Mass, the other activities follow, in line with the directives of the Universal and Local Church.

Admininstrator Sign In





About Us

logoThe story of Christ the King Cathedral is reminiscent of St. Paul's interpretation of Christian growth, (1 Cor 3: 6 - 7, 10): the one sows, the other waters; the one lays the foundation, all others build on this foundation. The final product is the Body of Christ, exalted, glorious, and holy.

Contact Us

  • abadiocese@gmail.com
  • +234 812 345 67
  • Catholic Diocese of Aba.